Marina Club Jetty
Specialized piling and structural works to extend and strengthen an existing jetty for boat berthing. Completed in 2021, as recorded in the profile.

Project overview
Specialized piling and structural works to extend and strengthen an existing jetty for boat berthing. Completed in 2021, as recorded in the profile.
Key Feature
Approximately 134 end-bearing piles, revised to 22 metres long; 1-metre pile caps, 12 mm reinforcement, interlocking systems, auger boring and concreting.